23XRV |
|
|
| DIMENSIONS |
|
|
| |
HEAT EXCHANGER | A | B | C |
| D | E | F | G |
SIZE |
| |||||||
|
|
|
|
|
|
|
| |
0 |
| |||||||
14- 71/4 | 0 |
| ||||||
| ||||||||
14- 71/4 |
| |||||||
| ||||||||
14- 71/4 |
|
Fig. 31 — 23XRV Machine Footprint
a23-46
VIEW
NOTES:
1.Dimensions in ( ) are in millimeters.
2.Isolation package includes 4 shear flex pads.
Fig. 32 — Standard Isolation
INSTALL ACCESSORY ISOLATION (if required) — Un- even floors or other considerations may dictate the use of accessory soleplates (supplied by Carrier for field installation) and leveling pads. Refer to Fig. 33.
Level machine by using jacking screws in isolation sole- plates. Use a level at least
IMPORTANT: Chiller support plates must be level within 1/2 in. from one end to the other end of the heat exchangers for effective oil reclaim system operation.
For adequate and long lasting machine support, proper grout selection and placement is essential. Carrier recommends that only
1.Check machine location prints for required grout thickness.
2.Carefully wax jacking screws for easy removal from grout.
3.Grout must extend above the base of the soleplate and there must be no voids in grout beneath the plates.
4.Allow grout to set and harden, per manufacturer’s instructions, before starting machine.
ACCESSORY SOLEPLATE DETAIL
a19-1109
a19-1110
VIEW X-X
LEGEND
HRS — Hot Rolled Steel
NOTES:
1.Dimensions in ( ) are in millimeters.
2.Accessory (Carrier supplied, field installed) soleplate package includes 4 soleplates, 16 jacking screws and leveling pads.
3.Jacking screws to be removed after grout has set.
4.Thickness of grout will vary, depending on the amount neces-
sary to level chiller. Use only
Fig. 33 — Accessory Isolation
23