![](/images/new-backgrounds/1078607/786073x1.webp)
CONTENTS
Page
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . 1
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Job Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Receiving the Machine . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
•INSPECT SHIPMENT
•IDENTIFY MACHINE
•INSTALLATION REQUIREMENTS
•PROVIDE MACHINE PROTECTION
Rigging the Machine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
•RIG MACHINE ASSEMBLY
•RIG MACHINE COMPONENTS
Separate Machine Components . . . . . . . . . . . . . . . . . 13
•SEPARATE COOLER AND CONDENSER
•REMOVE THE CONTROLS/DRIVE ENCLOSURE FROM THE CONDENSER
•REMOVE THE DISCHARGE PIPE ASSEMBLY FROM THE CONDENSER
•SEPARATE THE COMPRESSOR FROM THE CONDENSER
•SEPARATE THE VAPORIZER FROM THE
CONDENSER
VFD Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Install Machine Supports . . . . . . . . . . . . . . . . . . . . . . . . 22
•INSTALL STANDARD ISOLATION
•INSTALL ACCESSORY ISOLATION
•INSTALL SPRING ISOLATION
Connect Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
•INSTALL WATER PIPING TO HEAT EXCHANGERS
•INSTALL VENT PIPING TO RELIEF VALVES
Make Electrical Connections . . . . . . . . . . . . . . . . . . . . 30
•GROUNDING THE CONTROLS/DRIVE ENCLOSURE
•INSTALLING INPUT POWER WIRING
•WIRING THE FIELD WIRING TERMINAL STRIPS
•CONNECT CONTROL INPUTS
•CONNECT CONTROL OUTPUTS
•CONNECT STARTER
COMPLETING THE INSTALLATION . . . . . . . . . . .
Checking the Installation . . . . . . . . . . . . . . . . . . . . . . . . 43
Oil Pump and Oil Heater . . . . . . . . . . . . . . . . . . . . . . . . . 43
Connect Control Wiring . . . . . . . . . . . . . . . . . . . . . . . . . 43
Carrier Comfort Network Interface. . . . . . . . . . . . . . . 43
Install Field Insulation and Lagging . . . . . . . . . . . . . 44
INSTALLATION
CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . .
INTRODUCTION
General — The 23XRV machine is factory assembled, wired, and leak tested. Installation (not by Carrier) consists primarily of establishing water and electrical services to the machine. The rigging, installation, field wiring, field piping, and insulation of waterbox covers are the responsibility of the contractor and/or customer. Carrier has no installation respon- sibilities for the equipment.
Job Data — Necessary information consists of:
•job contract or specifications
•machine location prints
•rigging information
•piping prints and details
•field wiring drawings
•starter manufacturer’s installation details
•Carrier certified print
INSTALLATION
Receiving the Machine
INSPECT SHIPMENT
Do not open any valves or loosen any connections. The 23XRV machine may be shipped with a full refrigerant charge. Some machines may be shipped with a nitrogen holding charge as an option.
1.Inspect for shipping damage while machine is still on ship- ping conveyance. If machine appears to be damaged or has been torn loose from its anchorage, have it examined by transportation inspectors before removal. Forward claim papers directly to transportation company. Manufac- turer is not responsible for any damage incurred in transit.
2.Check all items against shipping list. Immediately notify the nearest Carrier representative if any item is missing.
3.To prevent loss or damage, leave all parts in original pack- ages until beginning installation. All openings are closed with covers or plugs to prevent dirt and debris from enter- ing machine components during shipping. A full operating oil charge is placed in the oil sump before shipment.
IDENTIFY MACHINE (Fig.
Fig. 1 — Refrigeration Machine Nameplate
2