Jefferson Direct Vent/Natural Vent Gas Heater
6.Install the elbow using 3 sheet metal screws at each joint.
7.Measure, and cut if needed, the appropriate length of pipe section needed to make the connection through the wall. Include a 2” overlap; i.e. from the elbow to the outside wall face, about 2” or the dis- tance required if installing a second 90° elbow. (Fig. 25)
8.Slip the wall plate and trim collar over the interior end of the horizontal pipe and install into the wall sleeve. Seal the joint inside the wall plate if needed to keep cold air from being drawn into the home.
9.Connect the horizontal pipe to the elbow. Fasten the wall plate to the pipe with three sheet metal screws. Slide the trim collar up against the wall plate to cover the screws. (Fig. 26)
X
ST215
Fig. 25 Measure the horizontal length.
Seal Both
Terminal Ends
Caulk Plate Joint with | ST217 |
Weatherproof Sealant |
Fig. 27 Install the vent terminal.
Vent Termination Below Grade
Install Snorkel Kit #7FSDVSKS when it is not possible to meet the required vent termination clearances of 12” (305 mm) above grade level. The snorkel kit will allow installation depth of down to 7” (178 mm) below grade level. The seven inches is measured from the center of the horizontal vent pipe as it penetrates the wall. If the venting system is installed below grade, a window well must be installed with adequate and proper drainage. (Fig. 28)
NOTE: Be sure to maintain side wall clearances and vent run restrictions. Refer to Pages 7,8, 9, Figures 3, 4, 7, 8.
Wall |
Sleeve |
ST216 |
Trim Collar
Wall Plate
1. | Establish the vent hole through the wall. |
2. | Remove soil to a depth of approximately 16” (406 mm) |
| below the base of the snorkel. Install a window well |
| (not supplied). Refill the hole with 12” (305 mm) of |
| coarse gravel and maintain a clearance of at least 4” |
| (102 mm) below the snorkel. (Fig. 28) |
3. Install the vent system as described on pages | |
4. | Be sure to make a watertight joint around the vent |
| pipe joint at the inside and outside wall joints. |
5. | Apply high temperature sealant around the inner |
| and outer snorkel collars. Join the pipes and fasten |
| the snorkel termination to the wall with the screws |
| provided. |
Fig. 26 Install the horizontal pipe and wall plate parts.
10.For both CFM and DuraVent Systems: Install the vent terminal. (Fig. 27) Apply high temperature seal- ant one inch from the ends of the inner and outer collars. Guide the inner and outer vent termination collars into the adjacent pipes. Double check that the vent pipes overlap the collars by 2”. Fasten the termination to the wall with the screws provided, and caulk the joint with weatherproof sealant.
11.For CFM only: Install Charcoal Gray Pipe Rings (#7FSDRG) or Polished Brass Pipe Rings (#7FSDRP) at pipe joints, if desired.
6. Level the soil to maintain a 4” clearance below the |
snorkel. |
If the foundation is recessed, use extension brack- |
ets (not supplied) to fasten the lower portion of the |
snorkel. Fasten the brackets to the wall first, and |
then fasten to the snorkel with |
sheet metal screws. Extend the vent pipes out as far |
as the protruding wall face. (Fig. 29) |
1818 | 30004177 |