Cisco Systems 3550 manual Powering the Switch and Connecting Devices, 2-16

Models: 3550

1 86
Download 86 pages 59.76 Kb
Page 46
Image 46
Powering the Switch and Connecting Devices

Chapter 2 Switch Installation

Powering the Switch and Connecting Devices

Step 6 Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ozf-in.)

Figure 2-18 Torquing Ground-Lug Screws on the Switch

DC 1

100-240V~ 5-3A 50/60Hz

CONSOLE

93286

Torque to 15 lbf-in.

Powering the Switch and Connecting Devices

These sections describe powering the switch, connecting an RPS, connecting cables, and inserting GBICs.

Powering the Switch

Use the supplied AC power cord to connect the AC power socket on the switch rear panel to an AC power outlet.

When the switch powers on, it automatically begins the power-on self-test (POST), a series of tests that verifies that the switch functions properly. When POST completes, the system LED is green. If the switch fails POST, the system LED is amber, and the port LED associated with the particular test is amber.

If POST fails, see Chapter 3, “Troubleshooting,” to determine a course of action.

Catalyst 3550 Switch Hardware Installation Guide

2-16

OL-6155-01

 

 

Page 46
Image 46
Cisco Systems 3550 manual Powering the Switch and Connecting Devices, 2-16