Figure C-2 Crimping the Ground Lug

Appendix C DC Power Connections

Connecting to DC Power

Step 4 Using a Panduit crimping tool, crimp the ground lug to the 6-gauge wire, as shown in Figure C-2.

Figure C-2 Crimping the Ground Lug

60529

Step 5 Use the two number-10-32 screws to attach the ground lug and wire assembly to the switch rear panel RPS connector, as shown in Figure C-3.

Step 6 Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ozf-in.)

Figure C-3 Torquing Ground-Lug Screws

36 - 72V 1 - 0.5A

Figure C-3 Torquing Ground-Lug ScrewsA

B

CONSOLE

Torque to 15 lbf-in.

65804