C H A P T E R 2

Preparing for Installation

This chapter describes the general equipment, safety, and site preparation requirements for installing the

C7200 VSA (VPN Services Adapter). This chapter contains the following sections:

Required Tools and Equipment, page 2-1

Hardware and Software Requirements, page 2-1

Online Insertion and Removal (OIR), page 2-3

Safety Guidelines, page 2-3

Compliance with U.S. Export Laws and Regulations Regarding Encryption, page 2-5

Required Tools and Equipment

You need the following tools and parts to install a VSA. If you need additional equipment, contact a service representative for ordering information.

VSA

Number 2 Phillips screwdriver

Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist strap included with all upgrade kits, field-replaceable units (FRUs), and spares

Antistatic mat

Antistatic container

Hardware and Software Requirements

This section describes the minimum software and hardware requirements for the VSA:

Software Requirements, page 2-2

Hardware Requirements, page 2-2

Restrictions, page 2-2

C7200 VSA (VPN Services Adapter) Installation and Configuration Guide

 

OL-9129-02

2-1

 

 

 

Page 25
Image 25
Cisco Systems C7200 manual Required Tools and Equipment, Hardware and Software Requirements