Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Reinstalling Components in the Router

If you elected to remove components from the chassis before removing it from the rack, you must now reinstall all the components in the chassis.

Reinstalling the Cards in the Upper and Lower Card Cages

Reinstall all of the cards from the upper and lower card cages in their original slots.

Reinstall all of the cards in the upper card cage as instructed in the “Reinstalling the Cards in the Upper Card Cage” section on page 3-52.

Reinstall all of the cards in the lower card cage as instructed in the “Reinstalling the Cards in the Lower Card Cage” section on page 3-53.

Caution Any unoccupied card slot in the upper or lower card cages must have a blank filler panel installed for electromagnetic compatibility (EMC) and to ensure proper air flow through the chassis. When the faceplate of a line card does not completely fill the card slot opening, a narrow card filler panel must be installed for electromagnetic compatibility (EMC) and to ensure proper air flow through the chassis.

Reinstalling the Cards in the Switch Fabric Card Cage

Reinstall all of the cards from the switch fabric card cage in their original slots as instructed in the “Reinstalling the Cards in the Switch Fabric Card Cage” section on page 3-50.

Replacing the Blower Modules

Replace the blower modules as instructed in the “Reinstalling the Blower

Modules” section on page 3-47.

Reinstalling the Power Modules

If you removed AC-input power supplies from the chassis, reinstall each power supply as instructed in the “Installing AC-Input Power Supplies” section on page 3-75.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-19

 

 

 

Page 19
Image 19
Cisco Systems 2654T6 Reinstalling Components in the Router, Reinstalling the Cards in the Upper and Lower Card Cages