Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

If you removed DC-input power entry modules, reinstall each power entry module as instructed in the “Installing DC-Input Power Entry Modules” section on page 3-78.

Reinstalling the Front Covers

When the router is repackaged for shipping, two foam inserts must be paced around the top of the router. To avoid interference with the foam inserts, the front cover for the power shelf and upper blower module should not be reinstalled on the router. It must be placed in its original box and packaged in the accessories boxed.

Reinstall the other front covers as instructed in the “Installing the Front Covers” section on page 3-39.

Repackaging the Router Accessories

To protect the accessories and the router from damage during shipment, you must repackage the router accessories in their original packaging and reassemble the accessories boxes into a package that is packed against the back panel of the router on the deck of the pallet body.

Repackaging the Rack-Mounting Platform

To repackage the rack-mounting platform, follow these steps:

Step 1 Remove the screws that fasten the angle brackets to the sides of the rack-mounting platform.

Step 2 Place the screws and brackets in a plastic bag.

Step 3 Screw the threaded leveling feet completely into the legs of the platform. Step 4 Turn the platform on its top and place it in its accessories box.

Step 5 Place the bag of screws and brackets in the accessories box.

Step 6 Place the corrugated pad foam side down on top of the platform.

Step 7 Close and seal the platform accessories box.

 

Cisco XR 12416 Router Chassis Installation Guide

A-20

OL-xxxxx-xx

Page 20
Image 20