Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Step 8 Shift the pallet to ensure that it is positioned evenly all the way around the scissor-jack platform and the bolt holes in the hold-down brackets on the sides of the scissor-jack platform are aligned with the holes in the top of the shipping pallet.

Step 9 Turn the scissor-jack screw slowly clockwise to close the scissor-jack platform and lower the top of the scissor-jack platform slowly until the hold-down brackets touch the top of the shipping pallet.

Step 10 Set a blocking plate into the hold-down bracket so that the blank side of the blocking plate is against the heads of the bolts in the side of the scissor-jack platform and the open holes in the blocking plate align with the bolt holes in the top of the pallet.

Step 11 Insert bolts through each of the hold-down bracket holes and into the holes in the top of the shipping pallet, then use the 9/16-inch (14-mm) wrench to tighten the bolts.

Step 12 Turn the scissor-jack screw slowly clockwise to collapse the scissor-jack platform and raise the base of the scissor-jack platform until the weight of the router and scissor-jack platform is absorbed by the pallet. Continue turning the scissor-jack screw clockwise to close the scissor-jack platform and lift the base of the scissor-jack platform until the scissor-jack platform is completely closed (the screw can not be turned).

 

Cisco XR 12416 Router Chassis Installation Guide

A-18

OL-xxxxx-xx

Page 18
Image 18
Cisco Systems STEV SRT-M-66, 2654T6 appendix Review Draft Cisco Confidential