Cisco Systems 2654T6, STEV SRT-M-66 appendix Review Draft Cisco Confidential

Models: 2654T6 STEV SRT-M-66

1 26
Download 26 pages 1.38 Kb
Page 3
Image 3

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

When the router and scissor-jack platform are installed on the pallet, the router and scissor-jack platform are suspended over the well formed by the pallet body and pallet front bar. When the scissor-jack platform is expanded to lower the platform base and support the weight of the router, the bolts securing the hold-down brackets to the top of the pallet can be removed. After the brackets have been detached from the pallet, the router and scissor-jack platform can be separated from the pallet by removing the pallet front bar from the pallet body and pulling the pallet body away from the scissor-jack platform.

The side walls of the shipping container are formed by two U-shaped, interlocking corrugated panels. The panels overlap to form the narrow ends of the container and are locked together by twelve plastic locking clips inserted into holes in the corrugated panels. Two foam inserts fit around the top of the router to act as a protective cushion and add rigidity to the packaging scheme by serving as a fixed buffer between the router, the corrugated side walls of the shipping container, and the corrugated top cap that holds the side walls in place. With the corrugated top cap installed, the entire shipping package is double-strapped end-to-end and side-to-side to secure the shipping container and its contents to the pallet.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-3

 

 

 

Page 3
Image 3
Cisco Systems 2654T6, STEV SRT-M-66 appendix Review Draft Cisco Confidential