
Appendix A Repackaging the Router
Repackaging the Routers
REVIEW DRAFT — CISCO CONFIDENTIAL
Figure A-6 
Closing the Scissor-Jack  Platform to Lower the Chassis
Front of chassis
| 
 | CONSOLE | 
| 
 | LE | 
| 
 | ERIRCXR | 
| 
 | EIVAC | 
| 
 | TCA | 
| SETRE | AUX | 
| 
 | 0 | 
| 1- 0- | 
 | 
| LOTS SLOT | |
| T | 
 | 
| JECE | 
 | 
TK P RIE RX R R VEI AC TCA
| RX | 
 | 
| 6 | 
 | 
| TX | 
 | 
| RX | RX | 
| 5 | 5 | 
| TX | TX | 
| RX | RX | 
| 4 | 4 | 
| TX | TX | 
| RX | RX | 
| 3 | 3 | 
| TX | TX | 
| RX | RX | 
| 2 | 2 | 
| TX | TX | 
| RX | RX | 
| 1 | 1 | 
| TX | TX | 
| RX | RX | 
| 0 | 0 | 
| TX | TX | 
R EIR EVI AC T C A
T R KP EIRXR R EV AC IT C A
RTPK EIR XR R EV AC TI C A
Chassis anchor
clip and bolt
(2 on each side)
/LT ACO
2
INOR
M
JOR
MA
ICAL
CRIT
1
0
29187
platform
Clockwise closes platform
Step 7 Position the safety hand truck at one side of the router, slide the router and 
Step 8 Tilt the safety hand truck onto its outrigger wheels to move the chassis to a level, open space with a solid floor, where the chassis can be repackaged for shipping.
| 
 | 
 | Cisco XR 12416 Router Chassis Installation Guide | 
 | 
 | 
| 
 | 
 | 
 | ||
| 
 | 
 | 
 | ||
| 
 | 
 | 
 | 
