O v e r h e a d P l u m b i n g D e t a i l s

Overhead piping installations above process connections require installing a check valve in the “To Process” line and a 12 inch {305 mm} riser with a check valve and vacuum break in the “From Process” line to prevent siphoning when shutting down the chiller. Install a vent tube at 12 inches {305 mm} above the highest system point to prevent over pressurization. Maximum height of piping above process connections is 25 ft {7.6 m}.

vacuum break

 

 

 

 

 

 

 

 

 

Internal vent; 1 ft above

 

 

 

 

 

 

 

 

 

highest water level

check valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 in. riser

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

From process

To process

back view

A p p e n d i x l G - 1