Assembly
ST_ P 4.
Master
Link
CabIe
Flat End
Troliey
Shaft
Pin
NotchBar
Install Chain and Cable
DO NOT REMOVE CHAIN AND CABLE FROM DIS. PENSER CA RTON.
Detach cable from side of carton and fasten to trolley with a master link from coin envelope
MASTER LINK PROCEDURE: Push pins of master link bar through loop of cable and hole in fiat end of trolley shaft Push cap onto pins and into notches Slide
Opene{ Chassis
Sprocket
CAUTION: Keep chain taut while dispensing from carton to help prevent kinking°
Slide trolley tight against screwdriver stop Dispense cable around pulley bracket. Proceed back around the opener sprocket and forward to chain retainer bracket. Be sure teeth on chassis sprocket engage chain.
Connect chain to chain retainer bracket, as shown in inset, using second master link from coin envelope
NOTE: Check to make sure chain is not twisted.
Chain
Tee Rail
Master
Chain Link
Retainer
Washered ScrewBracket
5/t
Threaded End
of Trolley Shaft
8 | _tley |
Master
Link
Cable
Pultey
Bracket
As a permanent trolley stop, insert 5t16" washered
screw into remaining hole in Tee rail front, Tighten se- curelywith 5/16" nut. REMOVE TEMPORARYSTOP INSERTED IN STEP 2,