CY7C1316BV18, CY7C1916BV18
CY7C1318BV18, CY7C1320BV18
Document Number: 38-05621 Rev. *D Page 19 of 31

Power Up Sequence in DDR-II SRAM

DDR-II SRAMs must be powered up and initialized in a
predefined manner to prevent undefined operations.
Power Up Sequence
Apply power and drive DOFF either HIGH or LOW (all other
inputs can be HIGH or LOW).
Apply VDD before VDDQ.
Apply VDDQ before VREF or at the same time as VREF.
Drive DOFF HIGH.
Provide stable DOFF (HIGH), power and clock (K, K) for 1024
cycles to lock the DLL.
DLL Constraints
DLL uses K clock as its synchronizing input. The input must
have low phase jitter, which is specified as tKC Var.
The DLL functions at frequencies down to 120 MHz.
If the input clock is unstable and the DLL is enabled, then the
DLL may lock onto an incorrect frequency, causing unstable
SRAM behavior. To avoid this, provide1024 cycles stable clock
to relock to the desired clock frequency.
Figure 3. Power Up Waveforms
> 1024 Stable clock
Start Normal
Operation
DOFF
Stable(< +/- 0.1V DC per 50ns )
Fix High (or tie toVDDQ)
K
K
DDQDD

VV

/DDQDD
VV
/
Clock Start (Clock Starts after Stable)
DDQ
DD
VV
/
~
~
~
~
Unstable Clock
[+] Feedback