G. LINEARITY ADJUSTMENT

TEST POINTS

S/W PULSE TEST PIN

PATH ADJ. FIXTURE

 

 

ENVELOPE TEST PIN

PATH ADJ. FIXTURE

 

 

 

 

MEASURING EQUIPMENT

OSCILLOSCOPE

 

 

 

 

ADJUSTMENT

VR CONTROL

PATH ADJ. FIXTURE

 

 

S/T GUIDE ROLLER

TAPE TRANSPORTING SYSTEM

 

 

 

 

a. Connect the PATH ADJ. FIXTURE to PT01 of the MAIN CIRCUIT BOARD. b. Play back the ALIGNMENT TAPE (COLOR BAR SIGNAL).

c. Connect the channel-1 scope probe to the S/W PULSE TEST PIN of the PATH ADJ. FIXTURE. d. Connect the channel-2 scope probe to the ENVELOPE TEST PIN of the PATH ADJ. FIXTURE. e. Adjust the VR CONTROL of the PATH ADJ. FIXTURE for maximum envelope signal output of the

alignment tape.

f. Adjust the S/T GUIDE ROLLER until the envelope signal waveforms of the entrance and exit sides are as shown in Fig. 5-7.

Fig. 5-7 LINEARITY ADJUSTMENT

32

Page 33
Image 33
Daewoo K3050MECHA service manual Linearity Adjustment