DCS BGB48-BQAR, BGB48-BQR manual Step, Installation, Gas Hook-Up

Models: BGB48-BQAR BGB48-BQR

1 76
Download 76 pages 26.67 Kb
Page 17
Image 17
STEP 1

INSTALLATION

GAS HOOK-UP

STEP 1

Place the tank restraint in the island (Fig. 11).

STEP 2

Locate the tank restraint in the island within the recommended area (Fig. 10 and 12).

STEP 3

Once located, secure to the bottom of the island using all eight hole locations provided on the restraint. Wood screws can be used for wooden floors or 1/4 inch diameter anchor screws or bolts may be used if the floor is concrete or masonry (Fig. 13).

STEP 4

When secure, place the LP cylinder into the tank restraint making sure to seat the tank all the way down, securely affixing the tank in the restraint (Fig. 14).

STEP 5

Attach the regulator hose assembly and operate the grill normally as described in the Use and Care manual (Fig. 15).

FIG. 14

FIG. 11

FIG. 12

FIG. 13

FIG. 15

15

Page 17
Image 17
DCS BGB48-BQAR, BGB48-BQR manual Step, Installation, Gas Hook-Up