![UPS Initial Startup](/images/new-backgrounds/127535/12753543x1.webp)
UPS Initial Startup
To start up the UPS:
1Verify that the internal batteries are connected.
2If an optional EBM is installed, verify that the EBM is connected to the UPS.
3Verify that the power input to the UPS has adequate upstream overcurrent protection:
Table 1. Minimum Upstream Circuit Breaker Rating
UPS Output Power | 120V | 208V | 230V |
|
|
|
|
500W | 15A | — | 15A |
|
|
|
|
1000W | 15A | — | 15A |
|
|
|
|
1500W (at 100V) | 20A | — | 15A |
1920W |
|
|
|
|
|
|
|
The power cord current ratings are listed in Table 2.
Table 2. Power Cord Ratings
Dell UPS Model and Voltage | Power Cord | Rating | Country | Supplied Cord Set | |
|
|
|
|
|
|
500W and 1000W | 100V | JIS C8303 to C13 | 12A | Japan | Optional |
|
|
|
|
|
|
|
| NEMA | 15A | North America | Yes |
|
|
|
|
|
|
|
| CNS | 15A | Taiwan | Optional |
|
|
|
|
|
|
500W and 1000W | 120V | C13 to C14 Jumper | 12A | Japan | Optional |
|
|
|
|
|
|
|
| NBR 14136 to C13 | 10A | Brazil | Optional |
|
|
|
|
|
|
|
| NBR 6147 to C13 | 10A | Brazil | Optional |
|
|
|
|
|
|
22 Installation