Dell K806N, K789N, K788N, 500W, H914N, H900N, H965N, J715N, J716N Installation, Inspecting the Equipment

Models: J716N 500W H965N H900N J715N K788N K806N H914N K789N

1 63
Download 63 pages 52.12 Kb
Page 11
Image 11
Installation

3

Installation

This chapter explains:

SEquipment inspection

SUnpacking the system

SUPS rear panels

SUPS internal battery connection

SUPS installation, including the External Battery Module (EBM)

SInitial startup

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after acceptance, file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service representative.

NOTE: Check the battery recharge date on the shipping carton label. If the date has passed and the batteries were never recharged, do not use the UPS. Contact your service representative.

Installation 11

Page 11
Image 11
Dell K806N, K789N, K788N, 500W, H914N, H900N, H965N, J715N, J716N manual Installation, Inspecting the Equipment