ASSEMBLING DUST CHUTE

The jointer stand has a built-in dust chute (A) Fig. 25. If this machine is to be used with a dust collection system, the supplied dust collector connector (B) Fig. 26, can be fastened to jointer stand (C) with four #10-16x1/2" sheet metal screws (D) as shown.

A standard 4" dust collection hose can be attached to dust collector connector.

A

D B

C

Fig. 25

Fig. 26

 

 

OPERATING CONTROLS AND ADJUSTMENTS

STARTING AND STOPPING JOINTER

1.The on/off switch is located underneath the switch shield (B) Fig. 31. To start the jointer, move switch (A) up to the “ON” position.

2.To turn the jointer “OFF”, push down on switch shield (B) Fig. 32, as shown.

B

A

Fig. 31

B

Fig. 32

12

Page 12
Image 12
Delta 37-275X, 37-195 Operating Controls and Adjustments, Assembling Dust Chute, Starting and Stopping Jointer