Desa LMFP33PR(A) Installing GAS Piping to Fireplace Location, Installation Items Needed

Models: LMFP33PR(A)

1 36
Download 36 pages 26.21 Kb
Page 13
Image 13
Framing Material

INSTALLATION

Continued

Wall board or facing material (above firebox) may be of combustible material, including decorative mantel ornaments or other similar projec- tions off of the facing material.

Firebox

Mantel Shelf

10"

8"

6"

2 1/2"

Noncombustible

 

 

Material May

 

 

Project Off this

 

 

Surface above

 

 

the Firebox

13"

16"

Hood

 

 

19"

21"

Wire-mesh Screen

 

Note: All vertical

Supplied

measurements are

from top of fireplace

Firebox

hood opening to

Hood

bottom of mantel

Must Be

shelf. These minimum

Used at

clearances replace any

All Times

other recommended

 

clearances supplied

 

with your ANSI Z21.11.2

 

approved gas logs.

Figure 18 - Minimum Mantel Clearances for Built-In Installation

INSTALLING GAS PIPING TO FIREPLACE LOCATION

WARNING: This appliance requires a 1/2" NPT (National Pipe Thread) inlet connection to the pressure regulator.

WARNING:Aqualifiedservice person must connect fireplace to gas supply. Follow all local codes.

CAUTION:Neverconnectpro- pane/LP fireplace directly to the propane/LPsupply.Thisfireplace requires an external regulator (not supplied). Install the external regulator between the fireplace and propane/LP supply.

WARNING: Never connect natural gas fireplace to private (non-utility) gas wells. This gas is commonly known as wellhead gas.

Installation Items Needed

Before installing fireplace, make sure you have the items listed below.

external regulator for propane/LP unit only (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap (optional)

tee joint

pipe wrench

approved flexible gas line with gas connector (if allowed by local codes) (not provided)

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the optional CSA design-certified equipment shutoff valve from your dealer. See Accessories, page 34.

111604-01L

www.desatech.com

13

Page 13
Image 13
Desa LMFP33PR(A) installation manual Installing GAS Piping to Fireplace Location, Installation Items Needed