Preparation
Continued
The gas supply line may be connected through the side framing or alternately through the lower
20
1
10
1 / 2"
1 / 2"
3 / 16
"
" /16 15 11
40
1 / 2"
24"
39 3/4" Min.
Figure 8 - Alternate Gas Supply Location
10 3/4" Square
Min.
Figure 6 - Rough Opening for Fireplace
Height
Depends
On
Installation
24"
Figure 9 - Rough Opening for Installing
Exterior Vent Terminal
|
|
|
| 39 3/4" |
|
|
|
| Min. |
Platform |
|
|
|
|
Must Be |
|
|
|
|
Solid, Flat, |
|
|
|
|
and Fully | 40 | 1 |
|
|
Supported | " |
| ||
|
| / |
| |
|
| 2 | * | |
|
|
|
|
Vertical
Height
90o Elbow
45o
Elbow
* As required by design as long as |
ceiling clearance is maintained. |
Figure 7 - Rough Opening for Installing
Fireplace on Platform
Depends on
Installation
263/8"
Horizontal
Length Depends
on Installation
Figure 10 - Vent Opening Height
www.desatech.com |