Desa (V)T32P SERIES Continued, Horizontal System Installation, USING TWO 90 ELBOWS

Models: (V)T32N SERIES (V)T32P SERIES

1 40
Download 40 pages 37.59 Kb
Page 13
Image 13
HORIZONTAL SYSTEM INSTALLATION
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.

20' max.45° Elbow 20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

111986-01D

www.desatech.com

13

Page 13
Image 13
Desa (V)T32P SERIES Continued, Horizontal System Installation, USING TWO 90 ELBOWS, with Termination at 90 with Fireplace