Eaton Electrical BladeUPS Bar manual Installation, Inspecting the Equipment, Setup, Tools Required

Models: BladeUPS Bar

1 28
Download 28 pages 2.56 Kb
Page 9
Image 9
Installation

Chapter 2

Installation

This section explains:

SEquipment inspection

SBladeUPS Bar 60 setup and installation

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after acceptance, file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service representative.

NOTE Check the battery recharge date on the shipping carton label. If the date has expired and the batteries were never recharged, do not use the UPS. Contact your service representative.

Setup

The BladeUPS Bar 60 comes with all hardware required for installation in a standard EIA or JIS rack with square and round mounting holes.

Tools Required

To assemble the components, the following tools may be needed:

STorque wrench with the following attachments:

-Hex socket size 10 mm for M6 hex bolt

-Hex socket size 8 mm for M5 hex bolt

STorque driver with a Pozidriv® #2 for Pozidriv M4 screw

SLarge screwdriver or crowbar for lifting the bar in place

SPliers for installing cage nuts

EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01

5

Page 9
Image 9
Eaton Electrical BladeUPS Bar manual Installation, Inspecting the Equipment, Setup, Tools Required, Chapter