Manuals
/
Emerson
/
Computer Equipment
/
Power Supply
Emerson
225-600KVA installation manual Specifications, Liebert NX
Models:
225-600KVA
1
38
40
40
Download
40 pages
50.89 Kb
33
34
35
36
37
38
39
40
<
>
Specifications
Install
Control Wiring Diagram
Warranty
Top-Terminal battery configuration
Liebert NX Stand-Alone Junction Cabinet terminal wiring
Alber battery monitoring assembly connections
Battery Room
Safety
Power Connection
Page 38
Image 38
Specifications
Liebert
®
NX
™
34
Page 37
Page 39
Page 38
Image 38
Page 37
Page 39
Contents
For Business-Critical Continuity
Liebert NX Battery System
Installation Manual-225-600kVA
CONTACTING LIEBERT FOR SUPPORT
Product Warranty Registration
BATTERY CABINET PRECAUTIONS
1.0 MECHANICAL INSTALLATION
TABLE OF CONTENTS
IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS
2.0 BATTERY INSTALLATION
FIGURES
TABLES
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
Risk of heavy unit falling over. Can cause equipment damage, injury and death
1.1 Introduction
1.0 MECHANICAL INSTALLATION
1.3.1 Battery Room
1.2 Preliminary Checks
1.4 Positioning
1.4.1 Moving the Cabinets
1.4.3 Raised Floor Mounting
1.5 System Composition
1.4.2 Clearances
2.2 Layout
2.1 Safety
2.0 BATTERY INSTALLATION
Note Remove knockout in the UPS low-voltage section to route control cables between the battery cabinet and UPS
2.4.1 Connected System
2.4 Power Connection
2.3 Cable Entry
2.4.2 Stand-Alone System
Liebert
Battery
Battery
Liebert
2.6 Alber Monitoring System-Optional
Battery Interface Board
2.7 External Battery Room Temperature Sensor-Optional
Bottom View
3.0 INSTALLATION DRAWINGS
Right Side 33.5 View
56.3
Front View
Figure 8 Main components, Liebert Top-Terminal Battery Cabinet
Installation Drawings
Liebert NX
Ground Bus Detail
DO NOT DOUBLE-STACK LUGS
Top View
Front View
Front
Figure 10 Front Terminal Battery Cabinet shipping split
Installation Drawings
Isometric View
Front View
Top View
Front
Right Side
Front
Figure 12 Front Terminal Battery Cabinet main components, layout
Installation Drawings
Right Side View
Installation Drawings
GROUND BUS DETAIL
BUS TERMINATION DETAIL
FOR POS. AND NEG. BUSBAR
Right Side
View
Figure 14 Liebert NX Stand-Alone Junction Cabinet terminal wiring
Front View
Installation Drawings
Terminal Details
Outline Drawing
Liebert NX
Liebert NX Battery Cabinet
Figure 16 Liebert NX Battery Cabinet control wiring
Installation Drawings
Control Wiring Routing
supplied with battery cabinet
Note Torque to 240in-lb 27 N-M Note Connections cannot be made
Installation Drawings
supplied with battery cabinet
Alber
Figure 19 Typical Alber battery monitoring connections
Input Fuse for Alber Power Alber Data Collector Module Alber Power
Controller
UPS Cabinet
Battery
Interface
Board
Installation Drawings
Figure 21 Alber battery monitoring assembly diagram
Alber battery monitoring assembly connections
Detail A
Liebert NX
Figure 22 Top-Terminal battery configuration
Installation Drawings
TRAY #1
FRONT
CABLE INTERCONNECT DIAGRAM
Liebert NX
Installation Drawings
Left-Side Busbar Connections Right-Side Busbar Connections
Specifications
4.0 SPECIFICATIONS
Liebert NX Battery Cabinet specifications
Liebert NX
Specifications
Liebert NX Junction Cabinet specifications
Table 4 Alber battery monitoring option specifications
DC currents for Liebert NX modules
Specifications
Liebert NX Battery Cabinet internal breaker
Liebert NX Battery Cabinet approximate weights
Liebert NX
Recommended conduit and cable sizes from Liebert NX UPS to DC supply
Battery torque values
Specifications
Liebert NX
Liebert NX
Table 10 Torque specifications, unless otherwise labeled
Specifications
400 - 1200 Amps
Specifications
Liebert NX
Specifications
Liebert NX
Page
Ensuring The High Availability
Of Mission-Critical Data And Applications