INDEX

Printed in U.S.A. ASCO Power Technologies,L.P. 2007
A
auxiliary circuits,1–2
C
cable
lugs, 1–2
preparation, 1–2
catalog number, inside cover
cleaning, 2–1
connections
line, 1–1
contact positionindicators, 1–3
controller, 1–1
disconnecting, 2–1
see Controller User’s Guide
E
electricaloperation, 1–8
emergency sourceaccepted light,
1–7
engine starting contacts, 1–2
F
frequency, generator, 2–2
functional test, 1–3 through1–8
G
ground, controller, 1–1
H
harness, 1–1
disconnect plugs, 2–1
HELP
customercare@asco.com
800–800–ASCO
I
indicators, contactposition, 1–3
inspection, 2–1
installation, 1–1
interlocked weights,1–6
L
labels,
engine start contacts, 1–2
rating, cover
lights, 1–7, 1–8
Load Disconnected light, 1–8
load disconnected, 1–3
lubrication,2–1
M
maintenance handle, 1–3 through –6
maintenance, preventive,2–1
manual load transfer,2–2
warning, 2–2
manual operation, 1–3, 1–4, 1–5, 1–6
illustration of, 1–3, 1–4, 1–5, 1–6
warning, 1–3
N
nameplate, cover
normal source accepted li ght, 1–6
O
operation
electrical,1–7
manual, 1–3, 1–4, 1–5, 1–6
illustration of, 1–3, 1–4, 1–5, 1–6
warning, 1–3
optional accessories
see Controller User’s Guide
P
parts, 2–1
phase rotation check, 1–5
problem, 2–2
R
rating label, cover
replacementparts, 2–1
S
service
in the U.S call 1–800–800–2726
in Canada call 1–888–234–2726
settings
see Controller User’s Guide
shaft indicators, 1–3
T
test, functional, 1–3 through 1–8
time delays, 2–1
see Controller User’s Guide
transfer switch connectedto emer-
gency light, 1–8, 2–1
transfer switch connect ed to normal
light, 1–8, 2–1
transfer switch positions, 1–3
TransferTest, 1–8
transfer to emergency,1–8
transfer to normal, 1–8, 2–1
trouble–shooting, 2–2
U
user controls and indicators
Retransferto Normal, 1–8
TransferTest, 1–8
V
voltage checks, 1–7
voltage, pickupand dropout settings
see Controller User’s Guide