Emerson UPS Systems installation manual Installation Drawings

Models: UPS Systems

1 36
Download 36 pages 16.53 Kb
Page 11
Image 11

Installation Drawings

2.0INSTALLATION DRAWINGS

Figure 2 Two-Breaker Maintenance Bypass Cabinet, one-input, attached

Two Breaker Maintenance Bypass Cabinet

FBO

MBB

I

MIB

 

BFB

Critical

Load

Load Bank

(FBO)

 

CB1

Main Input

 

Switchgear

UPS Module

 

 

Battery

 

System

DC Bus

CB2

 

 

N

 

MBJ

 

EG

 

MIB - Maintenance Isolation Breaker

MBD

MBB - Maintenance Bypass Breaker

FBO – Furnished By Others

 

N – Neutral

 

EG – Equipment Ground

 

MBJ – Main Bonding Jumper(3-wire systems only)

I - Option Interlock

7

Page 11
Image 11
Emerson UPS Systems installation manual Installation Drawings, Two-Breaker Maintenance Bypass Cabinet, one-input, attached