Empire Comfort Systems DVP42FP, P)-2 DVVK-4FVDIRECT VENT TERMINATION KIT cont, Figure, Roof Pitch

Models: DVP42FP P)-2

1 72
Download 72 pages 3.7 Kb
Page 23
Image 23
ROOF PITCH

DVVK-4FV DIRECT VENT TERMINATION KIT (cont.)

10.With the flex vent assembly and the 48” long hard pipe components laid out on the floor, begin securing these parts together. First, apply a generous bead of silicone sealant to the inside of the 4” diameter flex flue (not the end with the pre-installaed connector), then slide the flex flue over the 4” diameter hard pipe flue. Be sure to overlap at least 1-1/4”. Se- cure this connection with a 4” diameter band clamp provided. Be careful not to damage or tear the flex flue when tightening clamp.

11.Repeat the connection process for the outer 7” diameter flex vent to hard pipe connection. Use silicone sealant at this joint also, overlap at least 1-1/4”, then secure the joint with the 7” diameter band clamp provided. Be careful not to damage or tear the flex vent pipe when tightening the clamp.

12.While the venting is still on the floor, assemble the roof jack components as shown in Figure 34 and pre-install the roof jack assembly to the hard pipe approximately 18” from the top end of the hard pipe.

PIPE CLAMP

ROOF BRACKET (2)

WING NUT (2)

NUT (2) Manual background

SCREW (2)

Figure 34

13.Now the pre-assembled vent system may be carried to the roof, then lowered through the roof cutout opening (see step 5). Feed the flex vent end down through the roof opening and firestop/thimble assembly installed in steps 4 through 6.

14.Secure the roof support assembly to the roof sheathing with at least (4) nails/screws through each support bracket. Check that the combustible clearances through the roof framing will maintain at least a 1” clearance from the vent pipe.

15.Determine how high the vent terminal should be located above the roof line based on the roof pitch information shown in Figure 35. Adjust the vent system height by loosening the pre-installed roof support pipe clamp and sliding the vent pipe up or down as pre-determined, then re-tighten the pipe clamp. Install a couple of sheet metal screws through the pipe clamp into the outer hard vent pipe to lock in place.

16.Check to make sure that the bottom end of the flex vent is long enough to reach the fireplace adapter collars. If too long, trim off the extra flex vent not needed.

LOWEST

VENT CAPDISCHARGE

OPENING

GAS VENT

H

 

X

 

12

 

ROOF PITCH IS X/12

 

H (Min.) - Minimum height from

 

roof to lowest discharge opening

ROOF PITCH

H (Min.)

Flat to 6/12

12” (305mm)

6/12 to 7/12

15” (381mm)

Over 7/12 to 8/12

18” (457mm)

Over 8/12 to 16/12

24” (610mm)

Over 16/12 to 21/12

36” (914mm)

 

Figure 35

21759-6-0608

Page 23

Page 23
Image 23
Empire Comfort Systems DVP42FP, P)-2 installation instructions DVVK-4FVDIRECT VENT TERMINATION KIT cont, Figure, Roof Pitch