Energy Tech Laboratories EDP70 manual Battery Compartment, 24 12/18/24kVA

Models: EDP70

1 65
Download 65 pages 31.4 Kb
Page 29
Image 29

5.224 – 12/18/24kVA

Ensure the AC supplies and load are switched OFF. Check that all the EDP70 PLUS UPS Switches (behind the front panel) are switched OFF, see Figure 16 .

The AC supply cables must be suitable for carrying the maximum supply demand. The voltage drop in the cable should be minimized to ensure the AC supply voltage at the EDP70 PLUS UPS terminals is within +/- 10% of nominal.

The EDP70 PLUS UPS should be connected to the main/reserve supplies and output load via a wall mounted junction box.

Installation and connection should only be carried out by qualified electrical personnel.

S2 = Equipment Reserve Switch

S1 = Equipment ON/OFF Breaker

S3 = Equipment By-pass Switch

S4 = Equipment OUTPUT Breaker

Battery Compartment

Figure 16 - 24 – 12/18/24kVA: Switches and Breakers

MI00/10056 rev.1--05/2001-- page 29