5.1Electrical connections

WARNING!

All electrical connections must be made by a qualified electrician

and meet local electrical code standards

Before attempting to connect the mains supply, the reserve/bypass supply or the load, ensure that all supplies, including the battery, are isolated and that all the equipment switches are in their »OFF» position. Open UPS front access panel and remove internal panel over main switches and terminal blocks.

NOTES: 1) In accordance with para. 12.7 of UL 1778, the installation must be performed by a qualified electrician. The terminals require the use of the proper crimp tools and terminals in order to perform an installation in accordance with the National Electrical Code (NEC). The recommended crimp tools, terminals and torque are shown in the followings tables:

2)Use Copper Conductors Only

Table of T& B’s cat.no.s for terminals and crimp tools

page 28 --MI00/10056 rev.1--05/2001

Page 28
Image 28
Energy Tech Laboratories EDP70 manual Table of T& B’s cat.no.s for terminals and crimp tools, Electrical connections