Extron electronic SW4 3G HD-SDI user manual Rack mounting instructions

Models: SW4 3G HD-SDI

1 42
Download 42 pages 36.1 Kb
Page 17
Image 17

3. Mechanical loading — Mount the equipment in the rack so that a hazardous condition is not achieved due to uneven mechanical loading.

4. Circuit overloading — Connect the equipment to the supply circuit and consider the effect that circuit overloading might have on overcurrent protection and supply wiring. Consider equipment nameplate ratings when addressing this concern.

5. Reliable earthing (grounding) — Maintain reliable grounding of rack-mounted equipment. Pay particular attention to supply connections other than direct connections to the branch circuit (e.g., use of power strips).

Rack mounting instructions

For optional rack mounting, do not install the rubber feet. Mount the switcher to a rack shelf as follows:

1. If rubber feet are installed on the bottom of the unit, remove them.

2. Mount the switcher on the rack shelf, using two 4-40 x 3/16" screws in opposite (diagonal) corners to secure the switcher to the shelf.

3. Install blank panel(s) or other unit(s) to the rack shelf.

6" Deep Rack Shelf

1/2 Rack Width Front False

 

Faceplate

Front false faceplate uses 2 screws.

(2) 4-40 x 3/16" Screws

Use 2 mounting holes on opposite corners.

Mounting the switcher on a 6-inch deep rack shelf

SW4 3G HD-SDI • Installation and Operation

2-3

Page 17
Image 17
Extron electronic SW4 3G HD-SDI user manual Rack mounting instructions