3. Mechanical loading — Mount the equipment in the rack so that a hazardous condition is not achieved due to uneven mechanical loading.
4. Circuit overloading — Connect the equipment to the supply circuit and consider the effect that circuit overloading might have on overcurrent protection and supply wiring. Consider equipment nameplate ratings when addressing this concern.
5. Reliable earthing (grounding) — Maintain reliable grounding of
Rack mounting instructions
For optional rack mounting, do not install the rubber feet. Mount the switcher to a rack shelf as follows:
1. If rubber feet are installed on the bottom of the unit, remove them.
2. Mount the switcher on the rack shelf, using two
3. Install blank panel(s) or other unit(s) to the rack shelf.
6" Deep Rack Shelf | 1/2 Rack Width Front False |
| Faceplate |
Front false faceplate uses 2 screws.
(2)
Use 2 mounting holes on opposite corners.
Mounting the switcher on a
SW4 3G |