Table of Contents
Section 1: | Introduction | |
1.1 | General Description | |
1.2 | Specifications | |
1.3 | Equipment Overview | |
1.4 | Receiving Inspection | |
1.5 | Storage | |
1.6 | Procedures, Warnings, and Cautions |
Section 2: | Installation | |
2.1 | Installation | |
2.2 | Cable and Wiring Installation | |
Section 3: | Operation | |
3.1 | Operation | |
Section 4: | Operation | |
4.1 | Functional Description | |
4.2 | Readout Module | |
Section 5: Maintenance, Calibration, and Troubleshooting | ||
5.1 | Maintenance | |
5.2 | Calibration | |
5.3 | Troubleshooting | |
5.4 | Power Supply Measurements | |
5.5 | Signal Input Circuit | |
5.6 | Metering Circuit | |
5.7 | The Alarm Circuits | |
5.8 | High Alarm Circuit | |
5.9 | Muting Stages of the Alarm Circuits | |
5.10 | ESC Board | |
5.11 | Overall Fail Circuitry Associated with the ECS Test | |
5.12 | Starting with Pins M and P on the Power Supply Schematic | |
5.13 | Starting with Terminal H on Relay Driver Board | |
5.14 | Provision of Inputs to Terminals M and P on the Power Supply Board | |
5.15 | Outputs of U206 Pulse Generator on the ECS Board | |
5.16 | Operation of the Latch Circuit |
i