Friedrich YQ07, EQ08 operation manual Figure H, Step, Solid Masonry Construction

Models: EQ08 YQ07

1 40
Download 40 pages 26.4 Kb
Page 10
Image 10
STEP 7

920-197-01

STEP 7

Cut two pieces of standard 1" lumber (supplied by installer) to the

STEP 9 Complete the installation by following STEPS 6 through 10 of Sash

 

length and width required. Place in front and back of bottom sill chan-

Window Instructions (Page 8). Window Seal Gasket mentioned

 

nel as shown in Figure G. Secure with nails (supplied by installer).

in STEP 8 will not be required.

STEP 8

Seal all holes in the cabinet with caulking compound (supplied

IMPORTANT: Before operating your unit, read STEP 10 of Sash

 

by installer).

Window Instructions.

Figure H

SOLID MASONRY CONSTRUCTION

CAULK ALL SIDES

CABINET

MORTAR

NOTE: ELECTRICAL RECEPTACLE LOCATION

FROM POINT "X" MUST BE WITHIN A MAXIMUM

RADIUS OF 69" FOR 115V UNITS.

ELECTRICAL RECEPTACLE

POINT "X"

10

Page 10
Image 10
Friedrich YQ07, EQ08 operation manual Figure H, Step, Solid Masonry Construction