Frymaster 8195991 Required airflow for the combustion air supply is 2m3/h per kW, or more

Models: 8195991

1 50
Download 50 pages 32.9 Kb
Page 15
Image 15
Gas Connection Pipe Sizes

Gas Connection Pipe Sizes

(Minimum incoming pipe size should be 1 1/2" (41 mm))

 

 

 

 

4 or more

Gas

Single Unit
2 - 3 Units

 

units*

Natural

3/4" (22 mm)

1" (28 mm)

1

1/4" (36 mm)

Propane

1/2" (15 mm)

3/4" (22 mm)

 

1" (28 mm)

Manufactured

1" (28 mm)

1 1/4" (36 mm)

1

1/2" (41 mm)

 

 

 

 

 

*For distances of more than 20 feet (6 m) and/or more than 4 fittings or elbows, increase the connection by one pipe size.

The Pro H55 Series gas fryer has received the CE mark for the countries and gas categories indicated in the table below. NOTE: The nominal heat input (QN) is 21kW except for AT, DE, LU and category 3P/B, which is 23kW.

CE Approved Gas Categories by Country

COUNTRIES
CATEGORIES

GAS

PRESSURE (MBAR)

 

 

AUSTRIA (AT)

II2H3B/P

G20

20

 

 

G30, G31

50

 

 

 

 

 

 

BELGIUM (BE)

I2E(R)B

G20, G25

20, 25

 

 

I3+

G30, G31

28-30, 37

 

 

 

 

 

DENMARK (DK)

II2H3B/P

G20

20

 

 

G30, G31

30

 

 

 

 

 

 

 

II2Esi3+

G20, G25

20, 25

 

 

FRANCE (FR)

G30, G31

28-30, 37

 

 

 

 

 

II2Esi3P

G20, G25

20, 25

 

 

 

 

 

 

G31

50

 

 

 

 

 

 

FINLAND (FI)

II2H3B/P

G20

20

 

 

G30, G31

30

 

 

 

 

 

 

GERMANY (DE)

II2ELL3B/P

G20, G25

20

 

 

G30, G31

50

 

 

 

 

 

 

I3P

G31

50

 

 

GREECE (GR)

II2H3+

G20

20

 

 

G30, G31

28-30, 37

 

 

 

 

 

 

ITALY (IT)

II2H3+

G20

20

 

 

G30, G31

28-30, 37

 

 

 

 

 

 

IRELAND (IE)

II2H3+

G20

20

 

 

G30, G31

28-30, 37

 

 

 

 

 

 

LUXEMBOURG (LU)

II2E3B/P

G20

20

 

 

G30, G31

50

 

 

 

 

 

 

 

II2L3P

G25

25

 

 

NETHERLANDS (NL)

G31

50

 

 

 

 

 

II2L3B/P

G25

25

 

 

 

 

 

 

G30, G31

30

 

 

 

 

 

 

NORWAY (NO)

I3B/P

G30, G31

30

 

 

PORTUGAL (PT)

II2H3+

G20

20

 

 

G30, G31

28-30, 37

 

 

 

 

 

 

 

II2H3+

G20

20

 

 

SPAIN (ES)

G30, G31

28-30, 37

 

 

 

 

 

II2H3P

G20

20

 

 

 

 

 

 

G31

37, 50

 

 

 

 

 

 

SWEDEN (SE)

II2H3B/P

G20

20

 

 

G30, G31

30

 

 

 

 

 

 

UNITED KINGDOM (UK)

II2H3+

G20

20

 

 

G30, G31

28-30, 37

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CE Standard

Required airflow for the combustion air supply is 2m3/h per kW.

2-6

Page 15
Image 15
Frymaster 8195991 Required airflow for the combustion air supply is 2m3/h per kW, Gas Connection Pipe Sizes, or more