2-12 C120-E360-06EN
CHAPTER 2 Setup of the RCI for Operation
2.6 RCI Setup for Replacement of an RCI Base Cabinet2.6.1 RCI setup flow
RCI setup for replacement of an RCI host contains the following steps:
1Replacing an RCI host
2Confirming RCI initialization
3Connecting an RCI cable
4Making an RCI address setting
5Making an RCI replacement setting
Note: Perform this RCI setup work for each RCI host to be replaced.
2.6.2 Replacing an RCI host
Remove the T-branch connector together with the RCI cable from the RCI host to be
replaced, and replace the RCI host with a new one.
Do not connect the removed T-branch connector to the new RCI host at this time.
2.6.3 Confirming RCI initialization
Before connecting an RCI cable again to a new RCI host, confirm that RCI settings
have been initialized.
• To confirm RCI initialization:
1Execute the setrci (8) command to display the RCI status.
Confirm that the "address" value is 000f7fff (initial address value).
If RCI settings have not been initialized, perform the next step.
XSCF> setrci -c stat
HOST
address 000f7fff
Inactive
The command completed successfully.