5 Power Supply

5.1Power Supply Units

The PRIMERGY S60 storage subsystem contains two power supply units which guarantee the power supply to all installed components.

Using two power supply units, power supply redundancy is achieved. If a power supply unit fails, the subsystem will continue to operate without restrictions.

ITo guarantee a power supply unit redundancy, a failed power supply unit must be replaced urgently.

The power supply units are supplied with mains voltage via the supplied connecting cables.

The power supply units can be connected directly to two different phases of the in-house circuit in order to achieve phase redundancy (see section “Mains Connection with Phase Redundancy” on page 59).