Furuno SC-110 1.4Installing the Display Unit, 1.4.1Desktop, overhead mounting, 1.4.2Flush mount

Models: SC-110

1 89
Download 89 pages 1.46 Kb
Page 22
Image 22
1.4Installing the Display Unit

1. INSTALLATION

1.4Installing the Display Unit

The display unit can be installed on a desktop, overhead, or flush mounted in a console.

The optimal viewing distance is 0.5 m.

1.4.1Desktop, overhead mounting

1.Fasten the hanger to the mounting location with four tapping screws (supplied). See the outline drawing for mounting dimensions.

2.Screw the knobs into the display unit.

3.Set display unit to the hanger and tighten the knobs.

4.Run the ground wire between the ground terminal on the display unit and the ship’s superstructure.

DesktopOverhead

Display unit mounting methods

1.4.2Flush mount

Two types of flush mounts are available. See the outline drawing at the back of the manual for details.

Flush mount “F”

 

 

 

 

Flush mount “F” kit

Type: OP20-29, Code No: 000-041-405)

 

 

 

 

 

 

 

Name

 

Type

Code No.

Qty

 

Cosmetic Panel

 

20-016-1051

100-251-370

1

 

Tapping Screw

 

5X20

000-802-840

4

 

Hex Bolt

 

M6X12

000-862-127

2

 

Spring Washer

 

M6

000-864-260

2

1.Make a cutout in the mounting location. The dimensions are 183(W) x 92(H) mm.

2.Fasten the cosmetic panel to the display unit with hex bolts and spring washers.

3.Fasten the display unit to the mounting location with tapping screws.

1-10

Page 22
Image 22
Furuno SC-110 1.4Installing the Display Unit, 1.4.1Desktop, overhead mounting, 1.4.2Flush mount, 1-10, Flush mount “F”