Manuals
/
Brands
/
Power Tools
/
Power Hammer
/
GE
/
Power Tools
/
Power Hammer
GE
AK-50
- page 20
1
20
32
32
Download
32 pages, 3.73 Mb
20
Figure 30. Outline of the neutral sensor for AK-75 and AK-100 breakers
Contents
Main
INTRODUCTION
g
For GE Types AK-50, AKU-50, AKS-50, AKT-50, AK-75, and AK-100 Low-Voltage Power Circuit Breakers
TABLE OF CONTENTS
LIST OF FIGURES
SECTION 1. GENERAL INFORMATION
SECTION 2. BEFORE INSTALLATION
SECTION 3. FRONT FRAME BREAKER
Relocating and Remounting the W and X Relays
Installing the Flux Shifter Assembly
Page
Installing the Trip Paddle
Adjusting the Flux Shifter
Installing the Trip Unit Mounting Bracket
Page
SECTION 4. BACK FRAME
Crossbar Modification
Removing the Existing Trip Devices
Installing the Phase Sensors
Page
SECTION 5. INSTALLING THE TRIP UNIT
Configuring the Trip Unit
SECTION 6 FOUR-WIRE GROUND FAULT OPTION
Installing the Fourth-Wire Disconnect
Page
Page
Installing the Neutral Sensor
Page
SECTION 7. EQUIPMENT
Installing Mounting Brackets
Page
SECTION 8. TESTING AND TROUBLE- SHOOTING
Testing
Trouble-Shooting
Page
Page
Page
Page
Page
Page
Page
Page
g