Manuals
/
GE
/
Power Tools
/
Power Hammer
GE
AK-50
installation instructions
Fourth-wire disconnect for AKD-5 & AKD-6
Models:
AK-50
1
22
32
32
Download
32 pages
40.81 Kb
19
20
21
22
23
24
25
26
<
>
Troubleshooting
Install
FOUR-WIRE Ground Fault Option
Configuring the Trip Unit
Adjusting the Flux Shifter
EC or Power Sensor Trip System
Page 22
Image 22
Figure 34.
AK-50
&
AKS-50
fourth-wire
disconnect for AKD.
Figure 35.
Fourth-wire
disconnect for
AKD-5
&
AKD-6.
22
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
Introduction
Table of Contents
List of Figures
Before Installation
General Information
Front Frame Breaker Conversion
Relocating and Remounting the W and X Relays
Installing the Flux Shifter Assembly
Breakers with EC or Power Sensor Trip Systems
Breakers with a Side Bracket
AKU-50 Breakers Only
Adjusting the Flux Shifter
Installing the Trip Paddle
Breakers with ECS or SST Trip Systems
EC or Power Sensor Trip System
Installing the Trip Unit Mounting Bracket
ECS or SST Trip System
Trip unit mounting bracket attached to the mounting Plate
Back Frame Conversion
Crossbar Modification
AK-50 & AKS-50 Breakers with SST Trip Systems
Removing the Existing Trip Devices
AK-75 & AK-100 Breakers with SST Trip Systems
Installing the Phase Sensors
AK-50 & AKS-50 Breakers
Phase sensor installation on AK-75 & AK-100 breakers
AK-75 & AK-100 Breakers
Installing the Trip Unit
Configuring the Trip Unit
Installing the Fourth-Wire Disconnect
FOUR-WIRE Ground Fault Option
AK-50 & AKS-50 Stationary Breakers
AK-50 & AKS-50 Draw-Out Breakers
AK-75 & AK-100 Draw-Out Breakers
AK-75 & AK-100 back frame conversion
Installing the Neutral Sensor
Outline of the neutral sensor for AK-50 breakers
Outline of the neutral sensor for AK-75 and AK-100 breakers
Installing Mounting Brackets
Equipment Conversion
Fourth-wire disconnect for AKD-5 & AKD-6
Trouble-Shooting
Testing and TROUBLE- Shooting
Testing
Nuisance Tripping on Ground Fault-Equipped Breakers
AK-50
Page
Page
Appendix Drill Templates
Appendix 1. Drill Template for Flux Shifter Mounting
Page
Page
Page
Page
GE Industrial Systems
Top
Page
Image
Contents