Installation Instructions

7INSTALL MOTOR

Align and engage the

slots in the blower

Motor Attachment Bracket

assembly to the 3 hooks

 

at the rear of the

 

exhaust opening.

 

• Rotate motor upwards

Motor Hooks

until it aligns with the

attachment screw

 

location.

 

• Secure the motor to attachment bracket at the front of the opening with washer and screw provided.

• Plug the motor connector into the mating hood connector. See the illustration for the hood connector location. Touch the hood to locate and make the connection.

IMPORTANT: Hold the connector so the two square corner terminals

are at the top as you position the connector to plug it in.

8CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:

If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use cUL. approved anti- oxidant compound and aluminum-to-copper connectors.

A Remove

CInsert Power

 

Junction Box

Coduit Thru

 

Cover

Strain Relief

 

 

and Tighten

 

 

Ground

White

 

Black

B Check That White, Black and

 

Green Hood Wires Are Threaded

 

Thru Small Hole in Bracket

 

DUse cUL Listed Wire Nuts

Use wire nuts to connect incoming ground to green, white to white and black to black.

Push wires into junction box and replace cover. Be sure wires are not pinched.

9INSTALL DUCT COVERS

To install the 12” duct cover alone:

Place the 12” section of the decorative duct cover on top of the hood.

Secure the cover to the top of the hood with 4 screws provided.

To install the 12” duct cover alone:

Place the 2-piece duct cover on top of the hood.

Secure the bottom cover to the top of the hood with 4 screws provided. See illustration, page 16.

Extend the inside section upwards to meet the ceiling and ceiling bracket.

Secure the duct cover to the bracket with the 2 small Phillips screws provided.

10INSTALL FILTER SUPPORT

Tip filter support into the rear of the hood.

Insert support tabs into the slots at the rear of the hood.

Insert Tabs into Slots

Insert 2 Screws

• Secure the support to the hood with screws as shown.

1 Ft = 0.3 m 1” = 2.5 cm

17

Page 17
Image 17
GE CV936 manual Install Motor, Connect Electrical, Install Duct Covers, Install Filter Support

CV936 specifications

The GE CV936 is a versatile and powerful gas turbine designed for use in a variety of industrial and power generation applications. With its advanced design and state-of-the-art technologies, the CV936 represents a significant step forward in the field of aeroderivative gas turbines.

One of the standout features of the GE CV936 is its impressive efficiency. This turbine achieves a fuel efficiency rate that allows operators to maximize output while minimizing fuel consumption, thereby reducing overall operating costs. The efficiency extends beyond fuel usage, contributing to lower emissions as the turbine is designed to comply with rigorous environmental regulations.

The CV936 incorporates advanced aerodynamics in its design. Its blades are engineered using sophisticated computer modeling techniques that enhance airflow and optimize performance. The materials chosen for these components are lightweight yet durable, which contributes to the turbine’s ability to operate at high temperatures without degradation in performance.

A significant technology aspect of the GE CV936 is its modular design. This feature not only simplifies maintenance but also allows for quick and efficient upgrades as technology evolves. Operators can benefit from improved performance without needing to replace the entire turbine, which can be a cost-effective solution for many businesses.

Another characteristic that sets the CV936 apart is its robust control system. Coupled with advanced sensors and data analytics capabilities, the turbine provides real-time monitoring and operational insights. This allows for proactive maintenance strategies, reducing downtime and extending the operational lifespan of the equipment.

The turbine's design also accommodates a wide variety of fuels, making it exceptionally flexible for different operational contexts. Whether used in simple cycle, combined cycle, or cogeneration setups, the CV936 can efficiently use natural gas and liquid fuels, giving operators the flexibility to adapt to their specific energy needs.

In summary, the GE CV936 gas turbine is a cutting-edge solution that combines high efficiency, advanced aerodynamics, modular design, and robust control technologies. Its ability to adapt to various fuel types and configurations makes it an excellent choice for companies looking to optimize their power generation capabilities while minimizing environmental impact.