Consumer Support Troubleshooting Tips Installation Instructions Operating Instructions Safety Instructions
Installation instructions.
Important Installation Recommendations
Read entire manual. Failure to follow all guides and rules could cause personal injury or property damage.
•BE SURE TO FOLLOW ALL APPLICABLE STATE AND LOCAL CODES.
•Use a qualified installer.
•Do not install the Reverse Osmosis system outside or in extreme hot or cold temperatures.
DO NOT INSTALL ON HOT WATER.
•Recommended installation is under the sink. However, the unit can be installed in a remote location, up to 30 feet away from the sink. Additional installation materials may be required.
•If Reverse Osmosis system is connected to a refrigerator icemaker, a special icemaker connection kit is required (RVKIT). Do not use copper tubing for the connection between the Reverse Osmosis system and the refrigerator.
•Be sure the water supply conforms to the specifications; see the Specifications Guidelines section.
If water supply conditions are unknown, contact your municipal water company or your local health department for a list of contaminants in your area and a list of laboratories certified by your state to analyze drinking water.
WARNING: Do not use with water that is microbiologically unsafe or of unknown quality without adequate disinfection before or after the system. Systems certified for cyst reduction may be used on disinfected water that may contain filterable cysts. This system shall only be used for arsenic reduction on chlorinated water supplies containing detectable
Small parts remaining after the installation could be a choke hazard. Discard safely.
Tools and Materials Required for Installation
•Battery Powered Cordless Drill
•1/4″ Drill Bit
•
•Adjustable
•Phillips and Straight Screwdrivers
•Utility Knife
•Contents Included with the Product:
—Reverse Osmosis Assembly
—Product Literature (Owner’s Manual and Installation, Use and Care Video, Performance Data Sheet and Owner Registration Card)
—Water Supply Valve Parts Bag
—Drain Line Adapter
—27″ Length of 3/8″ Tubing
—Storage Tank
—Filter Replacement Reminder Label
—Water Test Kit
INSTALLER RESPONSIBILITY: The water supply valve (see the Feed Water Supply section) is included for use in areas where codes permit. Installer must comply with state and/or local codes. If not, the installer must provide fittings to tap the cold water pipe for a feed water source to the Reverse Osmosis system (must adapt to 1/4″ OD tubing).
10