Printhead, QL220- RK18278-1 & QL 220 Plus- RK17735-016

You must use an ESD strap and work at a properly grounded workstation (antistatic mat or tray). All electronic components must be placed on an ESD protective tray. If stored, any elec- tronic components must be placed in antistatic bags.

Installing the Printhead

1.Install the Printhead Assembly. Insert the left hand mounting ear of the Printhead Assembly into the Printer Frame. Rotate the other end into the Printer frame and snap into place.

2.Dress the Flex Cable from the Printhead Assembly through the Latch Lock.

3.Dress the Sensor Cable through the cutout on the Printer Frame.

Printhead Assy.

Insert this end first, then pivot op- posite end into Printer Frame.

Insert sensor cable through this coutout

Printer Frame

Insert printhead flex cable through cout- out in the Latch lock.

4.Install Printhead Springs. Snap (2) Springs, Printhead into place. Note that the loop end of the springs fit against the Printer Frame, and the other end will snap into slot features on the Printhead Assembly.

5.Install the Latch Shaft. Slide the Latch Shaft into the Printer Frame so that the Shaft protrudes from either side of the Printer Frame. The loops from the Printhead Springs should rest on the shaft.

Printhead Springs

Latch Shaft

RMAN-QLS-002 rev. A Repair Procedures

2-86

Page 63
Image 63
Zebra Technologies Q3DLUBA000002 manual Printhead, QL220- RK18278-1 & QL 220 Plus- RK17735-016, Installing the Printhead