6.Install the Upper Housing.

7.Install the QuickLink Module.

8.Install the Battery Pack

9.Test the Printer.

Display Cable

LCD Keypad

Installing a Membrane Key-

pad

Screw, Socket Hd. #4-40 x 1/4

Keypad Cable

 

& #4 Nylon Washer

 

1.Plug the flex circuit from the Keypad into J6. Lock the connector.

2.Fold the static ground strap from the Keypad so that exposed copper on the end of the ground strap will make contact with the pad on the MLB. Secure the Ground Strap to the MLB with the #4-40 x 1/4 Socket Hd. Screw and #4 Nylon Washer.

3.Slide the Keypad Assembly into the Lower Housing as shown, dressing the flex circuit and ground strap down and under the MLB.

4.Install the Upper Housing

5.Install the Wireless

Module.

Membrane Keypad

6. Install the Battery

Pack

7.Test the Printer. Screw, Socket Hd. #4-40 x 1/4

& #4 Nylon Washer

Keypad Cable

RMAN-QLS-002 rev. A Repair Procedures

2-76

Page 53
Image 53
Zebra Technologies Q3DLUBA000002, Q4DLU1B000000 manual Installing a Membrane Key Pad