nector latch as shown at “1”. 2. Plug in the Label Present Sensor

Dress the flex circuit from the Label present sensor under the latch lock and plug it into J5 of the MLB as shown at “2”. Close the connector latch.

3. Secure the Gap Sense ground strap

Secure the ground strap from the Gap Sense cable to the printhead heatsink with the retained Phillips head screw as shown at “3”. A spare screw is sup- plied with the Printhead replacement kit.

4. Install the Printhead Assembly

Insert the left hand tab of the printhead into the slot on the Printer Frame As- sembly (“4”). Rotate the printhead into the slot on the other side of the Print- er Frame at “5”.

5. Install the Latch Shaft

Install the Latch Spring (removed with the Latch Assembly) over the right hand side of the Latch Pivot Shaft. Hold the Latch Assembly at an angle to the Printer Frame (“1”) with one leg of the Latch Spring captured behind

4

5 1

2

3

RMAN-QLS-002 rev. A Repair Procedures

2-90

Page 67
Image 67
Zebra Technologies Q3DLUBA000002, Q4DLU1B000000 manual RMAN-QLS-002 rev. a Repair Procedures