Note: Ears of Printhead Assembly Mounting plate slide into Printer Frame.
Latch Shaft

Printhead, QL320 - RK18277-1 & QL 320 Plus- RK18465-003

You must use an ESD strap and work at a properly grounded workstation (antistatic mat or tray). All electronic components must be placed on an ESD protective tray. If stored, any elec- tronic components must be placed in antistatic bags.

Installing the Printhead

Printhead Assembly

Screw #4-40 x 3/16” Torque = 5 in-lbs

1. Secure

the Static Cable. Secure the static ground section of

the Gap Sensor Cable to the back of the Printhead Assembly with a Screw.

shown.

2. Locate the Printhead Assembly. Slide the Printhead Assembly into the Printer Frame as shown. The ears on the Printhead Assembly will fit into the Printer frame where

Dress the Printhead Cable as shown.

3.Install the Latch Shaft. Slide the Shaft, Latch into the Printer Frame.

4.Install the Printhead Springs. Snap the Printhead Springs into position. The leg of the Spring with a loop will fit over the Shaft, Latch and the other leg will fit into a slot in the Printhead Assembly.

Note: Location of loop on Printhead Spring secures over the Latch Shaft.

Press Springs into place with Tool p/n AU16259-1(Use of tool is optional)

Printhead Springs

Note: This end of the Printhead Spring snaps into mating slots on the Printhead Assembly.

P/n CL16985-3 CBL FLEX CRKT SHLD QL4 LBL SEN is included with repair kit RK18465-003. Instructions for installation of this cable are included in the procedure for AN16861- 015

2-87

RMAN-QLS-002 rev. A Repair Procedures