GE JBP95 warranty Wire Power Cord Installation

Models: JBP95

1 60
Download 60 pages 32.99 Kb
Page 51
Image 51
STEP 4
CONNECTOR
BLOCK

STEP 4

3 WIRE POWER CORD INSTALLATION

Remove the 3 wire terminal screws from the connector block. Insert screws through each power cord terminal ring and into the connector block until the screws engage the nuts. Be certain that the center wire is connected to the center screw of the connector block. Tighten screws securely. Do NOT remove ground strap connection.

NEUTRAL

TERMINAL

STEP 5Manual backgroundGROUND

STRAP

POWER CORD Manual backgroundManual backgroundManual backgroundManual background

WARNING: THE NEUTRAL OR GROUND WIRE OF THE POWER CORD MUST BE CONNECTED TO THE NEUTRAL TERMINAL LOCATED IN THE CENTER OF THE CONNECTOR BLOCK. THE POWER LEADS MUST BE CONNECTED TO THE OUTSIDE (BRASS COLORED) TERMINALS.

STEP 5

4 WIRE POWER CORD INSTALLATION

A.Remove the 3 screws from the connector block.

B.Remove the grounding screw and strap from the connector block middle location and the screw connection to the frame of the range.

BEFORE

NEUTRAL

TERMINAL

GROUNDING STRAP Manual background (GROUNDING TO RANGE)

C.Insert screws through each power cord terminal ring and into connector block until screw engages nut. Be certain that the center wire is connected to the center screw of the connector block. Tighten screws securely.

D.Attach ground wire to the frame of the range.

AFTER

NEUTRAL

TERMINAL

GROUNDING

TO RANGE

WARNING: THE NEUTRAL WIRE OF SUPPLY CIRCUIT IS CONNECTED TO THE NEUTRAL TERMINAL LOCATED IN THE CENTER OF THE CONNECTOR BLOCK. THE POWER LEADS MUST BE CONNECTED TO THE OUTSIDE (BRASS COLORED) TERMINALS. THE 4TH GROUNDING LEAD MUST BE CONNECTED TO THE FRAME OF THE RANGE WITH THE GROUNDING SCREW.

(continued next page)

51

Page 51
Image 51
GE JBP95 warranty Wire Power Cord Installation