Advance Planning

These ovens may be installed directly into a 27- in. or 30-in. wide oven cabinet.

The front surface of the oven will be nearly flush with surrounding cabinet doors.

This oven can be installed over any GE or Monogram single electric built-in oven, or a warming drawer or both.

Color matched side trim pieces are provided for installation into a 30-in. wide space. Use the side trim when installing the oven above a 30” wide wall oven or warming drawer. Discard the side trim pieces if you are installing over a 27-in. wide oven.

Cutout dimensions are the same for both 27-in. or 30-in. wide cabinet installations.

IMPORTANT: This oven is not approved for use above another built-in Speedcook oven, a side by side installation or below a countertop.

For personal safety, this oven cannot be installed in a cabinet arrangement such as an island or peninsula.

The oven must be installed at least 36 3/4 in. above the floor.

Allow for clearance to adjacent corners, walls, drawers, etc.

Cabinets installed adjacent to wall ovens must have an adhesion spec of at least 194ºF temperature rating.

The oven must be securely installed in a cabinet that is firmly attached to the house structure. Weight on the oven door could cause the oven to tip and result in injury. Never allow anyone to climb, sit, stand or hang on the oven door.

Electrical Requirements

Single Advantium 120 Installation

This product requires a 120 volt, 60 Hz, 15 amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency.

Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating.

The power supply cord and plug should be brought to a separate 15 or 20 ampere branch circuit single grounded receptacle. The outlet box should be located within reach of the 48-in. power cord.

Electrical Location

6”

9”

Locate outlet box in the shaded area

IMPORTANT: (Please read carefully). The power cord of this appliance is equipped with a three-prong (grounding) plug that mates with a standard three- prong grounding wall receptacle to minimize the possibility of electric shock. The customer should have the wall receptacle and circuit checked by a qualified electrician to make sure the receptacle is properly grounded and has the correct polarity.

Where a standard two-prong wall receptacle is encountered, it is the personal responsibility and obligation of the customer to have it replaced with a properly grounded three-prong wall receptacle. Do not, under any circumstances, cut or remove the third (ground) prong from the power cord. DO NOT USE AN EXTENSION CORD.