GE ZSC 1001, ZSC 1000 Door Assembly, Door-Removal Position, Door Removal, To disassemble the door

Models: SCB 1000 SCB 1001 ZSC 1000 ZSC 1001

1 46
Download 46 pages 13.99 Kb
Page 24
Image 24
Door Assembly

Door Assembly

WARNING: A microwave leakage test must be performed any time a door is removed, replaced, or adjusted for any reason. (See Diagnostic and Service Information.)

Door Removal

Caution: Do not close the door beyond the door removal position. Damage to the inner door panel will occur.

To remove the door, open the door fully and insert a door removal tool (Part # WB01X10318) in each door

To disassemble the door:

1.Remove the 4 screws from the glass mount.

2.Remove the choke cover.

3.Remove the 4 screws from the door frame, and remove door frame from the glass supporter.

4.Remove the 4 screws from the glass supporter, and remove the door handle and vent trim from the glass supporter.

SCB1000K and SCB1001K

hinge opening. The door can then be slowly closed a few inches to the door-removal position and lifted from the oven.

Tool

 

Tool

Latch

Latch

Spring

Glass

Supporter

Door

Handle

Glass Mount

Door Glass

Choke Cover

Latch

Spring

Door

Frame

Door Deco

Door Hinge Opening

ZSC1000K and ZSC1001K

Door-Removal Position

Latch

Latch

Spring

Door

Handle

Door Glass

Choke Cover

Latch

Spring

Door

Frame

Door Panel

– 24 –

Page 24
Image 24
GE ZSC 1001, ZSC 1000, SCB 1001, SCB 1000 manual Door Assembly, Door-Removal Position, Door Removal, To disassemble the door