Table of Contents
INTRODUCTION | IFC | |
Read this Manual Thoroughly | IFC | |
Operation and Maintenance | IFC | |
How to Obtain Service | IFC | |
Authorized Service Dealer Location | IFC | |
SAFETY RULES | 2 | |
Standards Index | 3 | |
Section 1 — GENERAL INFORMATION | 4 | |
1.1 | Generator | 4 |
1.2 | Transfer Switch | 4 |
1.3 | ATS Mode (Automatic Operation) | 4 |
1.4 | Generator AC Connection Systems | 4 |
1.5 | Main Circuit Breaker | 4 |
1.6 | Generator Fuel System | 5 |
1.7 | Engine Protective Devices | 5 |
1.8 | Unpacking | 6 |
1.9 | Lifting the Generator | 6 |
1.10 | Specifications | 6 |
1.11 | Fuel Consumption | 7 |
1.12 | Reconfiguring the Fuel System for LP Vapor | 7 |
1.13 | Engine Oil Recommendations | 7 |
1.14 | Coolant Recommendations | 8 |
1.15 | Before Installation | 8 |
Section 3 — OPERATION | 12 | |
3.1 | GTS Transfer Switch | 12 |
3.2 | Control Console Components | 13 |
3.3 | Manual Transfer and Startup | 15 |
3.4 | Engine Governor Gain Adjustments | 15 |
3.5 | Manual Retransfer and Shutdown | 15 |
3.6 | Automatic Operation | 16 |
3.7 | Weekly Exercise Cycle | 16 |
3.8 | Control Board DIP Switch Settings | 16 |
3.9 | Voltage Regulator Adjustment | 17 |
Section 4 — MAINTENANCE | 17 |
4.1Maintenance Performed by Authorized
| Service Facilities | 17 |
4.2 | Exhaust Manifold Procedure | 18 |
4.3 | Intake Manifold Procedure | 18 |
4.4 | Cylinder Head Procedure | 18 |
4.5 | Cooling System | 18 |
4.6Overload Protection for Engine DC
Electrical System | 19 |
4.7 Checking Fluid Levels | 19 |
4.8Maintenance Owner/Operator
| Can Perform | 19 |
4.9 | Miscellaneous Maintenance | 21 |
4.10 | Scheduled Maintenance | 22 |
Section 2 — INSTALLATION | 8 | |
2.1 | Standby Generator Installation | 8 |
2.2 | Generator Location | 9 |
2.3 | Generator Mounting and Support | 9 |
2.4 | Basic Standby Electric System | 9 |
2.5 | Emergency Circuit Isolation Method | 10 |
2.6 | Total Circuit Isolation Method | 10 |
2.7 | Grounding the Generator | 10 |
2.8 | Generator AC Neutral Connections | 10 |
2.9 | Using a “GTS” Transfer Switch | 10 |
2.10 | Battery Installation | 11 |
2.11 | Preparation Before | 12 |
Section 5 — TROUBLESHOOTING | 25 | |
Section 6 | — ELECTRICAL DATA | 26 |
Section 7 | — EXPLODED VIEWS AND |
|
| PARTS LISTS | 34 |
Section 8 | — INSTALLATION DIAGRAM | 51 |
Section 9 | — WARRANTY | 52 |
1