Operator's Manual

First Edition • Third Printing

 

 

 

 

OPERATING INSTRUCTIONS

Material Lifting Configuration

Observe and Obey:

Maintain safe distances between the operator, machine and fixed objects.

Be aware of the direction the boom will travel when using the platform controls.

Material Lifting Configuration Set up

1Turn the key switch to the off position.

2Remove the pin that secures the material lifting hook to the base. Remove the material lifting hook.

3Disconnect the platform controls from the platform.

4Remove the platform controls. Open the clamp on the back of the platform controls and slide the controls up and off.

5Open the controls side turntable cover.

6Disconnect the electrical cord on the bottom right side of the ground control box. Connect the platform control cord disconnected in step 3 to the ground control box. Close the turntable cover.

7Support the platform. Remove the toggle pin that secures the platform to the jib boom.

8Lift the platform up and remove it from the machine.

9To install the material lifting hook, insert the bottom rail into the platform mounting bracket and rotate up into position. Insert the toggle pin.

10Operate the material lifting hook from the ground with the platform controls. The key switch should be turned to the platform control position.

11Reverse the above process to install the platform and return the machine to a personnel lifting configuration.

26

Genie TMZ-50/30 & Genie TMZ-17/10

Part No. 72896

Page 28
Image 28
Genie TMZ-50, TMZ-30 manual Material Lifting Configuration Observe and Obey, Material Lifting Configuration Set up