VII) COMBO HEATING
This section serves as a guide for the installation and use of "Combo" heating systems utilizing a domestic water heater that has been specifically approved for such use. It is writ- ten for those knowledgeable in the required trades and pro- fessionals involved in the design and installation of Combo Heating Systems.
It is the responsibility of the installer/designer to follow all applicable codes to ensure the effectiveness and safety of the installation.
2.Install a drain valve at the lowest point of the heating loop so that water can be drained from the heating mod- ule without affecting the water heater.
3.If the air handler does not have a venting means at the highest point of the piping arrangement, install an air bleed at the highest point of the plumbing arrangement.
System Requirements
The following requirements must be met for the installation |
|
|
|
|
|
|
|
|
|
|
| |
|
|
| EXPANSION TANK |
|
| CHECK VALVE | ||||||
of Combo Heating Systems: |
|
|
| COLD | ||||||||
|
|
| (IF USED | |||||||||
|
|
|
| (OPTIONAL) |
|
| ||||||
1. | All components used for the distribution of water in the |
|
|
|
|
|
| SUPPLY | REQUIRES | |||
|
|
|
|
|
|
|
| |||||
| heating loop must be suitable for potable water. These |
|
| HOT WATER |
|
|
|
|
| EXPANSION | ||
|
|
| MIXING |
|
| TANK) | ||||||
| include all piping, fittings, solder and fluxes, pumps for |
|
| TO HOUSE |
|
|
| |||||
|
|
| FIXTURE | VALVE |
|
|
|
|
| |||
| circulation of water, valves, etc. |
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
| |
2. | The water heater must not be connected to a hydronic |
|
|
| 8in TO 12in | M | H |
|
|
| ||
| heating system that has been used previously. |
|
|
|
|
|
| |||||
3. | No boiler treatment chemicals of any kind shall be intro- |
|
|
| MAX. |
|
| C |
|
|
| |
|
|
|
|
|
|
|
|
|
| |||
CHECK |
|
|
|
|
|
|
|
|
| |||
| duced into the system. |
|
|
|
|
|
|
|
|
| ||
| VALVE |
|
| H O T |
|
|
|
|
| COLD | ||
4. | The Combo System components must be selected and |
|
|
|
|
|
|
| ||||
EXTERNAL |
| OUTLET |
|
|
|
|
| INLET | ||||
| sized to meet and maintain the total calculated |
| FLOW |
|
|
|
|
|
| |||
| CIRCULATOR |
|
|
|
|
|
|
| ||||
| demands for both domestic service hot water and space |
|
|
|
|
|
|
| ||||
|
|
|
| CONTROL |
|
|
|
|
|
| ||
| heating requirement. The sizing and installation must be | HOSE | BIB |
|
|
|
|
|
|
|
|
|
| performed in accordance with good engineering prac- | (OPTIONAL) |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| |
| tice such as "ASHRAE Handbooks", HRAI, |
|
|
| SUPPLY |
|
|
| WATER |
|
| |
|
| RETURN |
|
|
| HEATER |
|
| ||||
| "Hydronics Institute Manuals", CSA B149.1, NFPA |
|
|
|
|
|
|
|
|
|
|
|
| 54, ANSI Z223.1, CSA F280, National/Provincial | DRAIN/PURGE |
|
|
|
|
|
|
|
|
| |
| Building Codes, CSA C22.1, ANSI/NFPA 70, CSA | VALVE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| B51 and/or codes having jurisdiction. | I N T E R N A L |
|
|
|
|
|
|
|
|
| |
5. | The air handler (fan coil) and/or the circulating pump in | CIRCULATOR |
|
|
|
|
|
|
|
|
| |
AIR HANDLER |
|
|
|
|
|
|
|
|
| |||
| a baseboard hydronic loop will require a dedicated |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| |
| 120V circuit. This must be provided and identified for | Figure 29 Combo Heating - Air Handler |
| |||||||||
| this purpose. |
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| |
6. | All piping between the water heater and the air handler |
|
|
|
|
|
|
| ||||
|
|
| EXPANSION TANK | COLD | CHECK VALVE | |||||||
| or hydronic baseboard loop must be adequately insulat- |
|
|
|
| (OPTIONAL) |
|
| (IF USED | |||
|
|
|
|
|
|
| SUPPLY | REQUIRES | ||||
| ed to reduce heat loss. |
|
|
|
|
|
|
|
| |||
|
|
| HOT WATER |
|
|
|
|
| EXPANSION | |||
7. | If the local jurisdiction requires a |
|
|
|
|
|
|
| TANK) | |||
|
| TO HOUSE | MIXING |
|
| |||||||
| the cold water line, an expansion tank of adequate size |
|
| FIXTURE | VALVE |
|
|
|
|
| ||
| must be installed. |
|
|
|
|
|
|
|
|
|
|
|
8. | "Combo" Heating Systems require higher water temper- |
|
|
|
|
|
| C |
|
|
| |
|
|
| 8in TO 12in | M |
|
|
| |||||
| atures than other applications. When the system is |
|
|
| MAX. |
|
| H |
|
|
| |
|
|
|
|
|
|
|
|
|
|
| ||
| used to supply water for Combo Heating applications, a | CHECK |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |||
| means, such as mixing valve, must be installed to tem- | VALVE |
|
| H O T |
|
|
|
|
| COLD | |
| per the water in order to reduce scald hazard potential | EXTERNAL |
| OUTLET |
|
|
|
|
| INLET | ||
|
| FLOW |
|
|
|
|
|
| ||||
| (see Figures 29 & 30). | CIRCULATOR |
|
|
|
|
|
|
| |||
|
|
|
|
| CONTROL |
|
|
|
|
|
| |
Installation | HOSE | BIB |
|
|
|
|
|
|
|
|
| |
(OPTIONAL) | SUPPLY |
|
|
|
|
|
| |||||
The heating mode may be one of the following options: |
|
|
|
|
|
|
|
| ||||
| RETURN |
|
|
| WATER |
|
| |||||
|
|
|
|
|
|
|
|
| ||||
A. | A fan coil/air handler (Figure 29). |
|
|
|
|
|
| HEATER |
|
| ||
|
|
|
|
|
|
|
|
|
|
| ||
B. | A hydronic baseboard (finned tube) loop/In floor heating | HYDRONIC |
|
|
|
|
|
|
|
|
| |
| (Figure 30). |
|
|
|
|
|
|
|
|
| ||
| BASEBOARDS |
|
|
|
|
|
|
|
|
| ||
The following is a list of requirements for the installation of | (SERIES CON- |
|
|
|
|
|
|
|
|
| ||
the heating loop to the water heater. | NECTED |
|
|
|
|
|
|
|
|
| ||
SHOWN) |
|
|
|
|
|
|
|
|
|
1.Install
servicing of the water heater become necessary. | – 31 | Figure 30 Combo Heating - Baseboard |
| – |